Off shore processing ship
PRODUCT: Safety Step Platform
PROJECT: Ichthys Project
Ichthys Venturer is a floating production, storage and offloading facility (FPSO) is 336 metres long, the size of three soccer pitches laid end-to-end, and weighs approximately 150 thousand tonnes
Daewoo was commissioned to build the offshore processing ship, due to be stationed in Darwin. Due to the harsh tropical environment, it was a essential to specify corrosion-resistant climbing products that could with stand the punishing conditions.
Branach products ticked all the boxes and was chosen due to the anti corrosion compounds, strength and durability. With the added benefit of customized feet to secure footing over the grates, Branach was a clear choice for Daewoo. A mix of over 100 FPS and FPWs were supplied on time and within budget.